Skip to content
Snippets Groups Projects
Commit 01f4dad6 authored by Rob Hart's avatar Rob Hart
Browse files

edits

parent ad90ad2d
Branches master
No related tags found
No related merge requests found
......@@ -27,12 +27,28 @@ Complete Bill of Materials (BOM) [here](https://docs.google.com/spreadsheets/d/1
## Assembly of XY axes.
### first
### Assemble y-plates
### second
### third
### fourth
### Assemble xy-plate and table
### Assemble motor on motor mount.
### Assemble pulleys on pulley mount.
### Assemble X1 frame part with feet. Add Y1 and Y2 frame members.
### Add motor mounts.
### Place xy-plate on x-beam, and attach y-plates.
### Add to frame.
### Add final beam frame member.
### Add pulley plate and adjust feet.
### Add string.
Note how the string is inserted on the capstans. The string can be attached to temporary anchor points to provide enough tension during this step. Inside `capstan_pulley`, you should insert a small bearing at the top and bottom. Use appropriate washers to have the correct height; there are 4 levels on `capstan_pulley`, and they should be aligned between each levels of `capstan_motor`.
......
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment